Build and Fix Model has?
1 phases
3 phases
4 phases
None of other....
Waterfall model has?
6 phases
1 phases
4 phases
None of other....
Which is not a phase of Prototyping model ?
Quick Design
Requirement
Risk Analysis
Operation & Maintenance....
Each maturity in CMM model has ?
One KPA
Several KPAs
Equal KPAs
No KPA.....
KPA in CMM stands for ?
Key Process Area
Key Principal Area
Key Product Area
Key Performance Area.....
In reliability model, our emphasis is on ?
Errors
Failures
Faults.....
Which level of CMM for process control?
Initial
Defined
Repeatable
Optimizing.....
Which level of CMM for process management?
Initial
Managed
Repeatable
Optimizing.....
CMM was developed at ?
Harvard University
Carnegie Mellon University
Cambridge University....
Basic execution time model was developed by ?
Bev.Littlewood
R.Pressman
J.D.Musa
Victor Baisili....
NHPP stands for ?
Non Homogeneous Poisson Process
Non Homogeneous Poisson Product
Non Heterogeneous Poisson Process
Non Heterogeneous Poisson Product.....
CMM level 1 has ?
6 KPAs
0 KPAs
2 KPAs
None of others.....
Maximum possible value of reliability is ?
100
1
10
0.....
As the reliability increases, failure intensity ?
Decreases
no effect
Increases
None of others....
If failure intensity is 0.05 failures/hour during 10 hours of operation of software, its reliability can be expressed as ?
0.90
0.95
0.92
0.98.....
Which one is not a measure of software science theory?
Vocabulary
Level
Logic None of other....
A human mind is capable of making how many number of elementary mental discriminations per second (i.e, Stroud number) ?
5 to 20
1 to 10
20 to 40
40 to 80....
Minimal implementation of any algorithm was given the following name by Halstead?
Volume
Effective volume
Potential Volume None of others....
The module in which instruction of data elements in a module is called ?
Coupling
Modularity
Cohesion
None of others.....
The system that does not interact with external environment is called ?
Closed system
Open system
Logical system
Hierarchical system.....
The extent to which different modules are dependent upon each other called ?
Coupling
Modularity
Cohesion.....
Risk management activities are divided in ?
3 Categories
5 Categories
2 Categories
10 Categories....
Which one is not a risk management activity?
Risk assessment
Risk generation
Risk control
None of others....
The most desirable form of coupling is ?
Control coupling
Common coupling
Data coupling Content coupling....
Estimation of size for a project is dependent on ?
Cost
Time
Schedule
None of others....
In function point analysis number of complexity adjustment factors are ?
10
14
20
12....
COCOMO II estimation model is based on ?
Complex approach
Bottom up approach
Algorithmic approach
Top down approach.....
After finalization of SRS, we may like to estimate ?
Size
Development time
Cost
All of others....
Which one is not a size for measure for software ?
LOC
Cyclomatic Complexity
Function count
Halsteads program length...
Function count method was developed by ?
Beizer
M.Halstead
B.Boehm....